“ANALYSIS OF THE ASSEMBLY DURATION OF A PRECAST-MONOLITHIC FRAME FOR A LOW-RISE BUILDING”. 2026. MODERN CONSTRUCTION AND ARCHITECTURE, no. 15 (March): 117-28. https://doi.org/10.31650/2786-6696-2026-15-117-128.