“ANALYSIS OF THE ASSEMBLY DURATION OF A PRECAST-MONOLITHIC FRAME FOR A LOW-RISE BUILDING” (2026) MODERN CONSTRUCTION AND ARCHITECTURE, (15), pp. 117–128. doi:10.31650/2786-6696-2026-15-117-128.