[1]
“ANALYSIS OF THE ASSEMBLY DURATION OF A PRECAST-MONOLITHIC FRAME FOR A LOW-RISE BUILDING”, SBTA, no. 15, pp. 117–128, Mar. 2026, doi: 10.31650/2786-6696-2026-15-117-128.